| Subject: Looks like back gate is getting some much deserved paving attention! |
| From: Desert Shadow |
| Date: 05/04/2010, 08:39 |
| Newsgroups: alt.conspiracy.area51 |
I went for a little pre-Easter visit to see if the Easter Bunny had
left any eggs for the "Cammo Dudes" and found a little construction
going on at the back gate near Rachel. I haven't been there for about
a month so I am not sure what is going on. About 1/8 of a mile before
the back gate there is a large staging area for equipment. It is
perfectly rectangular with a entrance and an exit. It looks to be able
to hold quite a bit of material or equipment. There was nothing in
there today. The guard shack has quite a bit of gravel to the right of
the shack. At first I thought maybe they were putting up some new type
of berm. I am not sure if it is going to be used for filling in the
road and spraying the asphalt over it like they did on GLR. I guess it
could be used for some type of building construction. I am leaning
towards putting down a layer of gravel and then asphalt spraying it
like they did on GLR. I am left wondering why it was put there and not
in the cleared out area. Any thoughts?
Gravel pile
http://3.bp.blogspot.com/_OEQH6e3VqNU/S7gW8w0R8VI/AAAAAAAAAcI/pRgnsLav7rc/s1600/DVC00034.JPG
Staging area
http://4.bp.blogspot.com/_OEQH6e3VqNU/S7gW9FGRtMI/AAAAAAAAAcQ/oDLmqIGazgc/s1600/DVC00039.JPG